| Title: | Planning Application Summary | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
The information is also available here.
| ||||
| Title: | List of Planning Application Documents | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
The information is also available here.
| ||||
| Title: | Updated Application Form | |||
| Originator: | Asbri Planning Limited (Agent) | |||
| Date: | 2013-12-12 | View | ||
|
Revised Application Form.
For reasons not known, an attempt to submit this form in an underhanded, slightly fraudulent manner appears to have taken place. Although the form was received by Newport council on 23-04-2014, the Declaration at the foot of the form is dated 12-12-2013: the same date as the original Application Form. The updated form (using a more recent Newport council template) contains many material changes when compared with the original Application Form. It is not known why the Applicant wished to retain the original Declaration date on this more recent Application, but such tricks are often done to keep material changes 'under the radar'. Newport council has used a similar trick in the past when 're-issuing' a planning Decision Notice. The document is also available here.
| ||||
| Title: | Original Application Form | |||
| Originator: | Asbri Planning Limited (Agent) | |||
| Date: | 2013-12-12 | View | ||
|
Original Application Form dated 12-12-2013. At the time, the Applicant was Green Hill Construction
Limited.
The document is also available here.
| ||||
| Title: | Press Notice - Planning Application 13/1279 | |||
| Originator: | Newport council | |||
| Date: | 2014-11-15 | View | ||
|
It's not clear from the document which publications printed this Press Notice.
The document is also available here.
| ||||
| Title: | Decision Notice | |||
| Originator: | Newport council | |||
| Date: | 2015-08-11 | View | ||
|
The Decision Notice referenced several documents without specifying the issue dates of all
documents, and without requiring the documents to be compiled and approved by suitably qualified
professionals, and authorised for use. Because many documents were not page numbered, it was not
possible to determine whether a given document was complete, or how the reader could verify that
they were in possession of a complete set of Appendices.
According to the Decision Notice, the development "shall be carried out strictly in accordance with the following plans and documents:" Addendum to Environmental Statement - Volume 1 (Non-technical Summary) Addendum to Environmental Statement - Volume 2 (Addendum) Environmental Statement - Volume 3 (Appendices) Noise Impact Assessment for Proposed Residential Development (12 August 2014) Noise Impact Assessment for Proposed Residential Development (07 July 2014) Waterman Letter dated 28th May 2014 entitled 'Hydraulic Model Review Proposed Development at Herbert Road, Newport' Remediation Strategy Proposed Residential Development Herbert Road Newport (February 2014) Terra Firma letter dated 01 April 2014 entitled 'Additional Groundwater Monitoring: Herbert Road Newport' Acoustic Note entitled 'BASIC Barrier Attenuation - Based on CRTN' ** The above document was never made available on the Newport council Planning Portal Statement of Community Consultation Design and Access Statement Drawing sw49(00)01 - Location Plan Drawing sw49(04)01J - Proposed Site Layout Drawing sw49(04)06C - Boundary Treatments Drawing sw49(04)10B - Proposed Street Elevations (1 of 6) Drawing sw49(04)11B - Proposed Street Elevations (2 of 6) Drawing sw49(04)12B - Proposed Street Elevations (3 of 6) Drawing sw49(04)13B - Proposed Street Elevations (4 of 6) Drawing sw49(04)14B - Proposed Street Elevations (5 of 6) Drawing sw49(04)16E - Proposed Site Sections (1 of 3) Drawing sw49(04)17E - Proposed Site Sections (2 of 3) Drawing sw49(04)18E - Proposed Site Sections (3 of 3) Drawing sw49(04)G100A - 3P 2B Flats - Floor Plans and Elevations - Plots 232-243 Drawing sw49(04)G200A - 3P 2B Flats - Floor Plans and Elevations - Plots 244-251 Drawing sw49(04)L100C - 3P 2B Flats - Floor Plans and Elevations - Plots 1-36 Drawing sw49(04)L200C - Block 1 - 799+877 House Types - Floor Plans and Elevations Drawing sw49(04)L300B - Block 2 - 910+666 House Types - Floor Plans and Elevations Drawing sw49(04)L400C -3P 2B Flats -Floor Plans and Elevations Drawing sw49(04)L500A -Block 3 910+666 House Types -Floor Plans and Elevations Drawing sw49(04)L600B -Block 4 -799 House Type -Floor Plans and Elevations Drawing sw49(04)L700B -Block 5 -910 House Type -Floor Plans and Elevations Drawing sw49(04)L800B -Block 6 -799+666 House Type -Floor Plans and Elevations Drawing sw49(04)L900B -Block 7 -799+666 House Types -Floor Plans and Elevations Drawing sw49(04)L1000B -Block 8 -799+666 House Type -Floor Plans and Elevations Drawing sw49(04)L1100C -Block 9 -877 House Type -Floor Plans and Elevations Drawing sw49(04)L1200C -Block 10 -877+666 House Type -Floor Plans and Elevations Drawing sw49(04)L1300B -3P 2B + 2P 1B flats -Ground and First Floor Plans -Plots 62-83 Drawing sw49(04)L1301A -3P 2B + 2P 1B flats -Second and Third Floor Plans -Plots 62-83 Drawing sw49(04)L1302B -3P 2B + 2P 1B flats -Elevations -Plots 62-83 Drawing sw49(04)S200A -2B 3P Flats -Elevations -Plots 186-191 Drawing sw49(04)S300A -2B 3P Flats (adapted) -Floor Plans -Plots 192-204 Drawing sw49(04)S301B -2B 3P Flats (adapted) -Elevations -Plots 217-228 Drawing sw49(04)SH100A -1B 2P Flats -Elevations -Plots 180-185 Drawing sw49(ENG)500B -Foul and Surface Water Drainage Layout (1 of 4) Drawing sw49(ENG)501B -Foul and Surface Water Drainage Layout (2 of 4) Drawing sw49(ENG)502B -Foul and Surface Water Drainage Layout (3 of 4) Drawing sw49(ENG)503B -Foul and Surface Water Drainage Layout (4 of 4) Drawing sw49(ENG)700B -General Arrangement -Section 38 Agreement (1 of 4) Drawing sw49(ENG)701B -General Arrangement -Section 38 Agreement (2 of 4) Drawing sw49(ENG)702B -General Arrangement (3 of 4) Drawing sw49(ENG)703B -General Arrangement -Section 38 Agreement (4 of 4) Drawing 2396 -Topographical Survey Un-numbered drawing -clarification of application area in the vicinity of Morgan Street (received 11.12.2014) Un-numbered drawing -clarification of boundary wall treatment near Morgan Street (received 11.12.2014) Reason: to comply with Welsh Government Circular 016/2014, Paragraph 5.30 The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 1 - Non-Technical Summary | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2014-04 | View | ||
|
This April 2014 version is an updated Non-Technical Summary. Curiously, both Para 2.8 and 2.13 refer
to a 'Chapter 2A' which was never included in this document! Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The previous December 2013 version of the Non-Technical Summary stated that the Local Planning Authority (Newport council) had not advised that an assessment of the cumulative impacts was necessary. Therefore, no assessment of the cumulative impacts was included in the first version of the Environmental Statement. This apparent attempt by Newport council to circumvent the Law by 'salami slicing' the overall development of the site was clearly unlawful. Following critism by Chepstow Friends of the Earth, Newport council corrected its error and this led to a hurried re-drafting of the Environmental Statement in an attempt to include the cumulative impacts of all development activity on the site. It is clear that the hurriedly-prepared update to the Environmental Statement was not as complete as it needed to be. In particular, the eventual Environmental Statement makes no mention of radioactive waste being present on the site. Also, the Contents page is missing and, as menetioned, the text refers to a non-existant 'Chapter 2A'. Overall this document contains many errors. It's not clear that anyone read the document prior to it being released. The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 1 - Non-Technical Summary | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2013-12 | View | ||
|
Note that no one put their name to this document. Therefore, it's not clear that the document has
been either prepared or approved by a suitably qualified professional. It would appear that the
document has not been authorised for use.
This December 2013 version of the Non-Technical Summary was superceded by the April 2014 version. This version of the Non-Technical Summary stated that the Local Planning Authority (Newport council) had not advised that an assessment of the cumulative impacts was necessary. Therefore, no assessment of the cumulative impacts was included in the first version of the Environmental Statement. This apparent attempt by Newport council to circumvent the Law by 'salami slicing' the overall development of the site was clearly unlawful. Following critism by Chepstow Friends of the Earth, Newport council corrected its error and this led to a hurried re-drafting of the Environmental Statement in an attempt to include the cumulative impacts of all development activity on the site.
| ||||
| Title: | Environmental Statement - Volume 2 - Written Statement | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2013-12 | View | ||
|
Note that no one put their name to this document. Therefore, it's not clear that the document has
been either prepared or approved by a suitably qualified professional. The pages are not numbered,
and it would appear that the document has not been authorised for use.
Newport council planning web site states that this document is "SUPERSEDED IN PART (Chapters 9, 10 & 15 superseded)", but it is not clear what this means. Nevertheless the comment does provide a hint that any attempt to understand the Environmental Statement is made extraordinarily difficult because piecing together an up-to-date set of documents becomes impossible. Indeed the Originator has successfully made a paperchase out of the Environmental Statement documentation process. The resulting Environmental Statement is a hotchpotch of poorly controlled documents where it is difficult to determine which chapters are still relevant, and which ones are not. Alarmingly, Para 2.11 states "We note that no request for an assessment of cumulative impacts was made by Newport City Council's screening and scoping opinion (Appendix 1.2 refers); therefore, this is not considered in detail as part of each technical assessment contained in this written statement". It follows that this Environmental Statement is of no practical value. The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 2 - Addendum | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2014 | View | ||
|
Received by Newport council 09.04.2014
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Cover page | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2013-12 | View | ||
|
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Contents Page | |||
| Originator: | Asbri Planning Limited | |||
| Date: | Not dated | View | ||
|
Contents
This Contents list to Volume 3 is hopelessly inaccurate, and made the task of finding documents almost impossible. It's as though someone deliberately set out to make identifying and finding EIA documents as difficult as possible, hence creating the ultimate paper chase. The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 1.1 | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2012-10-19 | View | ||
|
Request for Screening Opinion and Scoping Opinion
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 1.2 | |||
| Originator: | Newport council | |||
| Date: | 2012-11-26 | View | ||
|
EIA Screening Opinion
Newport council failed to ensure that this EIA Screening Opinion considered cumulative impacts, even though the Countryside Council for Wales had made it abundantly clear that an Environmental Impact Assessment would need to address cumulative impacts. The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 1.3 | |||
| Originator: | Newport council | |||
| Date: | 2012-11-26 | View | ||
|
EIA Scoping Opinion
Newport council failed to ensure that this EIA Scoping Opinion required cumulative impacts to be considered, even though the Countryside Council for Wales had made it abundantly clear that an Environmental Impact Assessment would need to address cumulative impacts. The document is also available here.
| ||||
| Title: | Design and Access Statement | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2013-12 | View | ||
|
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 3.1 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
sw49 (00) 01 - Site Location Plan
The validity of this document is in doubt because the Revision in the Title Block is missing. Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 3.2 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 4.1 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 4.1A - Prioposed Site Layout. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 6.1 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 6.2 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 6.3 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 6.4 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 6.5 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.1 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 7.1A - Decision Notice - Permission 00/0768. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.2 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.3 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.4 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.6 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.7 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.8 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.9 | |||
| Originator: | Waterman | |||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.10 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.11 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 7.12 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 8.1 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 8.1A - Newport council Letter agreeing phased approach to permission 00/0768. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 8.2A - Appropriate Assessment - Permission 03/1531. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.1A - Extract from Newport LDP Proposals Map. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.2A - Approved Layout Plan - Permission 03/1531. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.3A - WG Development Advice Map. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.4A - CNC.NRW Flood Map. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.5A - Map of Soil Types. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.7A - Hydrological Study of the on-site Ordinary Watercourse (Lottery's Reen). RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.8A - Comparison of Peak Flood Levels - Consented scheme versus Proposed scheme. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.6A - Peak Flood Depths. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 9.9A - Flood Consequences Assessment. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 10.2A - DCWW - Map of Drainage Infrastructure around the site. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information Environmental Statement - Volume 3 - Appendix 11.1 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.2 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.3 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.4 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.5 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.6 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.7 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.8 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.9 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.10 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.11 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.12 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.13 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.14 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.15 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.16 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.17 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.18 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.19 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.20 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.21 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.22 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.23 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 11.24 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 12.1 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 12.1A - Noise Impact Assessment. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 12.2 (Noise Survey) | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Supporting Information ES Appendix 12.2A - Analysis of the Planning Status of land adjacent to the site. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 12.3 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 12.4 | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
Appendix :
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 13.1 | |||
| Originator: | Waterman | |||
| Date: | Not dated | View | ||
|
Appendix 13.1:
The document is also available here.
| ||||
| Title: | Environmental Statement - Volume 3 - Appendix 13.2 | |||
| Originator: | Waterman | |||
| Date: | Not dated | View | ||
|
Appendix 13.2: Air Quality Model Verification
The document is also available here.
| ||||
| Title: | Scrambled Drawing List - Green Hill Construction Limited drawings | |||
| Originator: | Not known | |||
| Date: | Not dated | View | ||
|
This undated list of Green Hill Construction Limited drawings was received by Newport council on
05/01/2015.
The validity and usefulness of this document is in serious doubt because neither the date, nor the originator of this list is indicated within the document. The content of this document appears to have been thrown together in a disorderly manner and serves no useful purpose. Note that no one put their name to this document. Therefore, it's not clear that the document was either prepared or approved by a suitably qualified professional. It would appear that the document was never authorised. The document is also available here.
| ||||
| Title: | Noise Impact Assessment for Proposed Residential Development - 12.08.2014 | |||
| Originator: | ||||
| Date: | 2014-08-12 | View | ||
|
Although the Decision Notice references this document, it was never made available on the Newport
council planning web site.
| ||||
| Title: | Noise Impact Assessment for Proposed Residential Development - 07.07.2014 | |||
| Originator: | ||||
| Date: | 2014-07-07 | View | ||
|
The document is also available here.
| ||||
| Title: | Waterman Letter dated 28th May 2014 entitled 'Hydraulic Model Review Proposed Development at Herbert Road, Newport' | |||
| Originator: | Waterman | |||
| Date: | 2014-05-28 | View | ||
|
Although the Decision Notice references this document, it was never made available on the Newport
council planning web site.
| ||||
| Title: | Remediation Strategy (12032/RS-V3) - February 2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Letter dated 01 April 2014 entitled 'Additional Groundwater Monitoring: Herbert Road Newport' | |||
| Originator: | Terra Firma | |||
| Date: | 2014-05-28 | View | ||
|
Although the Decision Notice references this document, it was never made available on the Newport
council planning web site.
| ||||
| Title: | Acoustic Note entitled 'BASIC Barrier Attenuation - Based on CRTN' | |||
| Originator: | ||||
| Date: | View | |||
|
Although the Decision Notice references this document, it was never made available on the Newport
council planning web site.
| ||||
| Title: | Statement of Community Consultation | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||
| Title: | Drawing sw49(04)01, Rev J - Proposed Site Layout | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Dec '14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(04)06, Rev C - Boundary Treatments | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Dec '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)10, Rev B - Proposed Street Elevations - Sheet 1 of 6 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)11, Rev B - Proposed Street Elevations - Sheet 2 of 6 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)12, Rev B - Proposed Street Elevations - Sheet 3 of 6 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)13, Rev B - Proposed Street Elevations - Sheet 4 of 6 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)14, Rev B - Proposed Street Elevations - Sheets 5 of 6 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)15, Rev B - Proposed Street Elevations - Sheet 6 of 6 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-12 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "DEC '13" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)16, Rev E - Proposed Site Sections - Sheet 1 of 3 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2014-02 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "FEB '14" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)17, Rev E - Proposed Site Sections - Sheet 2 of 3 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2014-02 | View | ||
|
The validity of this document is in doubt because someone made a right pigs ear of this document.
The date in the Title Block reads "FEB '14"; the date on the drawing history reads "Sept 14"; and
it's marked "Sheet 3 of 3" instead of Sheet 2 of 3.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)18, Rev E - Proposed Site Sections - Sheet 3 of 3 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2014-02 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "FEB '14" but
the date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)G100, Rev A - 3P 2B Flats - Floor Plans & Elevations - Plots 232-243 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "01.04.14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)G200, Rev A - 3P 2B Flats - Floor Plans & Elevations - Plots 244-251 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "01.04.14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L100, Rev C - 3P 2B Flats - Floor Plans & Elevations - Plots 1-36 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L200, Rev C - Block 1 - 799 + 877 House Types - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Jan 15".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L300, Rev B - Block 2 - 910 + 666 House Types - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L400, Rev C - 3P 2B Flats - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Jan 15".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L500, Rev A - Block 3 - 910 + 666 House Types - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in serious doubt because the date on the Drawing Control Panel
reads "Oct 13" but the date in the Revision Block reads "Sept 14". Also, the Revision on the Drawing
Control Panel reads "A" but the Revision in the Revision Block reads "B".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L600, Rev B - Block 4 - 799 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L700, Rev B - Block 5 - 910 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L800, Rev B - Block 6 - 799 + 666 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L900, Rev B - Block 7 - 799 + 666 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L1000, Rev B - Block 8 - 799 + 666 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L1100, Rev C - Block 9 - 877 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Jan 15".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L1200, Rev C - Block 10 - 877 + 666 House Type - Floor Plans & Elevations | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Jan 15".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L1300, Rev B - 3P 2B + 2P 1B Flats - Ground & First Floor Plans - Plots 62-83 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L1301, Rev A - 3P 2B + 2P 1B Flats - Second + Third Floor Plans - Plots 62-83 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in serious doubt because the date in the Title Block reads "Oct 13"
but the date in the Revision Block reads "Sept 14". Also, the Revision in the Title Block reads "A"
but the Revision in the Revision Block reads "B".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)L1302, Rev B - 3P 2B + 2P 1B Flats - Elevations - Plots 62-83 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)S200, Rev A - 2B 3P Flats - Elevations - Plots 186-191 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)S300, Rev A - 2B 3P Flats - Floor Plans - Plots 192-204 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)S301, Rev B - 2B 3P Flats - Elevations - Plots 217-228 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Jan 15".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(04)SH100, Rev A - 1B 2P Flats - Elevations - Plots 180-185 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | 2013-10 | View | ||
|
The validity of this document is in doubt because the date in the Title Block reads "Oct 13" but the
date in the Revision Block reads "Sept 14".
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(ENG)500, Rev B - Foul and Surface Water Drainage Layout - Sheet 1 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing sw49(ENG)501, Rev B - Foul and Surface Water Drainage Layout - Sheet 2 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(ENG)502, Rev B - Foul and Surface Water Drainage Layout - Sheet 3 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(ENG)503, Rev B - Foul and Surface Water Drainage Layout - Sheet 4 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(ENG)700, Rev B - General Arrangement - Section 38 Agreement - Sheet 1 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(ENG)701, Rev B - General Arrangement - Sheet 2 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(ENG)702, Rev B - General Arrangement - Sheet 3 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing SW49(ENG)703, Rev B - General Arrangement - Section 38 Agreement - Sheet 4 of 4 | |||
| Originator: | Green Hill Construction Limited | |||
| Date: | Not dated | View | ||
|
The validity of this document is in doubt because the date in the Title Block is missing.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing 2396 - Topographical Survey | |||
| Originator: | Davies Surveys Limited | |||
| Date: | 2012-10 | View | ||
|
The document is also available here.
| ||||
| Title: | Drawing - clarification of extent of Application Area in the vicinity of Morgan Street | |||
| Originator: | Not known | |||
| Date: | Not dated | View | ||
|
The validity and usefulness of this document is in serious doubt because neither the date nor the
originator of this document is indicated within the document.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Drawing - clarification of boundary wall treatment near Morgan Street | |||
| Originator: | Not known | |||
| Date: | Not dated | View | ||
|
The validity and usefulness of this document is in serious doubt because neither the date nor the
originator of this document is indicated within the document.
Note that no one put their name to this document. Therefore, it's not clear that the document has been either prepared or approved by a suitably qualified professional. It would appear that the document has not been authorised for use. The document is also available here.
| ||||
| Title: | Legal Agreement - Between Newport City Council and Riversee Limited | |||
| Originator: | Newport council | |||
| Date: | 2015-08-10 | View | ||
|
This is a Section 106 (S106) Agreement between the Local Planning Authority (LPA) and the developer
whcih sets out certain obligations, especially financial obligations, linked to a grant of planning
permission 13/1279.
This S106 agreement appears to acknowledge that the development will have a significant impact on the local area that could not be managed by means of conditions attached to a planning decision. In particular, it seems that this agreement acknowledged that the new development would place extra pressure on the social, physical, and economic infrastructure of the St Julians area. The planning obligations in this legal agreement have sought to balance the pressures created by the new development by seeking certain remedies, including financial payments to Newport City Council. The document is also available here.
| ||||
| Title: | Officer Report | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
Although this report recommended that Planning Application 13/1279 be granted with conditions, the
validity and usefulness of this document is in doubt because neither the date of this report, nor
the originator of this document is indicated within the document.
Note that no one put their name to this document. Therefore, it's not clear that the document was either prepared or approved by a suitably qualified professional. It would appear that the recommendation within this document was never authorised. The document is also available here.
| ||||
| Title: | Prevention of Disruption to Gas Supplies | |||
| Originator: | Wales & West Utilities | |||
| Date: | 2013-12-24 | View | ||
|
This document provides general conditions to be observed for the protection of apparatus and the
prevention of disruption to gas supplies.
The document includes a map dated 23/12/2013. The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Senior Scientific Officer - Air Quality and Anti-Dig Barrier | |||
| Originator: | Senior Scientific Officer, Newport council | |||
| Date: | 2015-01-16 | View | ||
|
This email recommends a non-dig barrier at the interface between the capping layer and made ground
in all garden areas north of the reen. This is where the PCB waste was found during the school
development. The bulk of it has been removed off site but it's not possible to completely rule out
residual contamination.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Welsh Water - Conditions requested | |||
| Originator: | Welsh Water | |||
| Date: | 2014-11-28 | View | ||
|
Welsh Water reference PLA0008910.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Welsh Water - Infrastructure Map | |||
| Originator: | Welsh Water | |||
| Date: | Not dated | View | ||
|
Welsh Water reference PLA0008910.
The document is also available here.
| ||||
| Title: |
Statutory Consultation Response - Senior Environmental Health Officer
Requires updated noise assessment |
|||
| Originator: | Newport council | |||
| Date: | 2014-11-28 | View | ||
|
The email states that the noise assessment previously submitted should be revised in order to ensure
that appropriate mitigation measures are provided to the dwellings and gardens.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Ecology Officer - No objection | |||
| Originator: | Ecology Officer | |||
| Date: | 2014-11-24 | View | ||
|
The email states "Any lighting along the road must not cause any light spill onto the river bank or
any of the vegetation that is to be planted along the bund. This must remain a dark corridor for
commuting species, in particular otters and bats."
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Tree Officer - No objection | |||
| Originator: | Newport council | |||
| Date: | 2014-11-24 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Network Rail - Comments | |||
| Originator: | ||||
| Date: | 2014-11-20 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Scientific Officer - Conditions required | |||
| Originator: | Newport council | |||
| Date: | 2014-11-18 | View | ||
|
The requirement for full contaminated land conditions remains.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - PRoW Officer - No further comments. | |||
| Originator: | ||||
| Date: | 2014-11-19 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Senior Traffic and Development Officer - No objection | |||
| Originator: | Newport council | |||
| Date: | 2014-11-14 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Planning Policy Officer - No further comment | |||
| Originator: | Newport council | |||
| Date: | 2014-11-12 | View | ||
|
Relates to the increase to 251 dwellings from 248.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Principal Landscape Architect - No objection | |||
| Originator: | Newport council | |||
| Date: | 2014-11-11 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Planning Policy - 03.11.2014 | |||
| Originator: | Newport council | |||
| Date: | 2014-11-03 | View | ||
|
This document was never made available via the Planning Portal. Instead, an unrelated document was
posted in its place.
The spurious document is also available here.
| ||||
| Title: | Statutory Consultation Response - Development Manager, Housing Strategy - No Objection | |||
| Originator: | Newport council | |||
| Date: | 2014-10-30 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Tree Officer - No comment | |||
| Originator: | Newport council | |||
| Date: | 2014-10-28 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Drainage Officer - Comments | |||
| Originator: | Newport council | |||
| Date: | 2014-08-12 | View | ||
|
Drainage and infiltration concerns raised.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Senior Environmental Health Officer | |||
| Originator: | Newport council | |||
| Date: | 2014-08-19 | View | ||
|
No concerns about Apex Joinery, but further information required regarding land said to be vacant.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - NRW - Appropriate Assessment | |||
| Originator: | Natural Resources Wales | |||
| Date: | 2014-08-12 | View | ||
|
The email response from NRW states "Provided the conditions are implemented NRW is of the opinion
that adverse impacts on the River Usk SAC would be avoided."
And copntinues "However, as always Newport City Council (NCC) must assure itself that it has a high degree of confidence that any conditions set, or actions proposed, will both achieve the aim of avoiding adverse effects and will be implemented as specified." The document is also available here.
| ||||
| Title: |
Statutory Consultation Response - Senior Traffic and Development Officer - Objection Objects to infiltration based element of drainage |
|||
| Originator: | Newport council | |||
| Date: | 2014-08-08 | View | ||
|
Drainage and infiltration concerns raised.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - NRW - Regarding Contamination & Flood Risk | |||
| Originator: | Natural Resources Wales | |||
| Date: | 2014-07-31 | View | ||
|
Concerns raised about flood risks and land contamination.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Natural Resources Wales - Advice provided | |||
| Originator: | Natural Resources Wales | |||
| Date: | 2014-07-29 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Senior Environmental Health Officer - Objection | |||
| Originator: | Newport council | |||
| Date: | 2014-07-29 | View | ||
|
Further information is needed, including a review of the noise mitigation measures.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Highways - Comments on layout changes | |||
| Originator: | Newport council | |||
| Date: | 2014-07-01 | View | ||
|
Concerns over car parking allocations.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Housing Strategy - No objection | |||
| Originator: | Newport council | |||
| Date: | 2014-07-17 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - GWT - Objection | |||
| Originator: | Gwent Wildlife Trust | |||
| Date: | 2014-06-09 | View | ||
|
This email states " . . . development is likely to negatively affect the River Usk SAC and its
features (particularly migratory fish and otter) through disturbance during and after construction.
There is also a risk of pollution (contaminants and/or sediment) entering the watercourse."
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - NRW - Objection | |||
| Originator: | Natural Resources Wales | |||
| Date: | 2014-05-21 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Environmental Health - Concerns raised | |||
| Originator: | Newport council | |||
| Date: | 2014-05-16 | View | ||
|
Concerns regarding noise.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Scientific Officer - Conditions required. | |||
| Originator: | Newport council | |||
| Date: | 2014-05-02 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Councillor Townsend - 02.05.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Highways - 02.05.2014. Comments. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Network Rail - 29.04.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - DCWW - 28.04.2014. Conditions requested | |||
| Originator: | DCWW | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Biodiveristy Officer - 25.04.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Landscape Officer - 23.04.2014. Comments. | |||
| Originator: | Newport council | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Heddlu Gwent Police - ALO - 23.04.2014. No objection. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Strategic housing - 14.04.2014. Not clear what is affordable - does not meet WG standards. 1 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Strategic housing - 07.03.2014. No objection. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Strategic housing - 07.03.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.31279 - DCWW - 04.03.2014. Object. | |||
| Originator: | DCWW | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - CNC.NRW - 05.02.2014. Object | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Highways - Drainage - 03.02.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Ecology Officer - Objection | |||
| Originator: | Newport council | |||
| Date: | 2014-01-28 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response - Highways - Comments | |||
| Originator: | ||||
| Date: | 2014-01-23 | View | ||
|
More information required.
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Heddlu Gwent Police - traffic - 21/01/2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Network Rail - 17.01.2014 | |||
| Originator: | Network Rail | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - GWT - 15.01.2014. Object. | |||
| Originator: | GWT | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Newport council Scientific Officer - 13.01.2014. Advises conditions be applied. | |||
| Originator: | Newport council | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - PRoW - 09.01.2014 | |||
| Originator: | PRoW | |||
| Date: | 2014-01-09 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Planning Policy - January 2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Tree Officer - 20.12.2013 | |||
| Originator: | ||||
| Date: | 2013 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Strategic housing - 23.12.2013 | |||
| Originator: | ||||
| Date: | 2013 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Architectural Liaison Officer (Heddlu Gwent Police) - 30.12.2013 | |||
| Originator: | Waterman | |||
| Date: | 2013 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Landscape Officer - 20.12.2013 | |||
| Originator: | ||||
| Date: | 2013 | View | ||
|
The document is also available here.
| ||||
| Title: | Statutory Consultation Response 13.1279 - Wales and West utilities - 30/12/2013 | |||
| Originator: | Wales and West utilities | |||
| Date: | 2013 | View | ||
|
The document is also available here.
| ||||
| Title: | Welsh Government Decision - Planning application 13/1279 not called-in | |||
| Originator: | Welsh Government | |||
| Date: | 2014-09-18 | View | ||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 13.1279 - 05.05.2014. Affordable housing, location and type. | |||
| Originator: | Asbri Planning Limited | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 13.1279 - email string with agent - 23.04.2014. Regarding landscaping. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 13.1279 - Covering Letter - 08/04/2014. Relates to submission of 'further information'. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 13.1279 - Sutton SRT - 03.01.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 13.1279 - SRT - 15.01.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Drawing Issue List - Green Hill Construction Limited drawings | |||
| Originator: | Letrucco Design Limited | |||
| Date: | Not dated | View | ||
|
This undated list of Green Hill Construction Limited drawings was received by Newport council on
05/01/2015.
The validity and usefulness of this document is in doubt because neither the date, nor the originator of this list is indicated within the document. The information it contains conflicts with so many of the drawlings listed, that this document serves no useful purpose. Note that no one put their name to this document. Therefore, it's not clear that the document was either prepared or approved by a suitably qualified professional. It would appear that the document was never authorised. The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - 9 Courtney Street - Objection | |||
| Originator: | Neighbour | |||
| Date: | 2014-11-21 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - 72 Orchard Street - Objection | |||
| Originator: | Neighbour | |||
| Date: | 2014-11-12 | View | ||
|
Flooding and drainage concerns.
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - 3 Courtney Street - Objection | |||
| Originator: | Neighbour | |||
| Date: | 2014-11-13 | View | ||
|
Flooding and sewerage concerns.
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - 61 Stafford Road - Concerns over drainage | |||
| Originator: | Neighbour | |||
| Date: | 2014-11-03 | View | ||
|
The emails states "There have been two serious flooding incidents at my client's property in
approximately the last 12 months, one of which where the surface water was contaminated by sewage."
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - Payne - Raises concerns. | |||
| Originator: | Neighbour | |||
| Date: | 2014-09-02 | View | ||
|
The email states ". . . application point 8.7.2 states that our site is vacant, this is not true
we have continued to use the site for all our painting of structural steel, we have now been
able to lease out the site to a shot blasting and painting company". The email continues "Also in one part it goes on about installing retaining walls between 600 and 1500 mm high to the boundary of our site then building up the level of the land behind, will this increase the risk of us flooding from surface water or a deluge of rain on our site." The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - Hodge - Objection | |||
| Originator: | Neighbour | |||
| Date: | Not dated | View | ||
|
Concerns over school places and site access. Possibly sent in June 2014.
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - neighbour - 7 Charnwood Road - 18.04.2014. Object. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - Neighbour - 33 Morgan Street - 14.04.2014. Object. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - neighbour - 127 Durham Road - 05.03.2014. Redacted. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - Newport Sea Cadets - 20.02.2014. No objection. | |||
| Originator: | Newport Sea Cadets | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - Newport Sea Cadets - 08.02.2014. Object. | |||
| Originator: | Newport Sea Cadets | |||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - 72 Orchard Street - 29.01.2014. Object. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - 3 Courtney Street - 28.01.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - Neighbour - 3 Darlington Court - Objection | |||
| Originator: | Neighbour | |||
| Date: | 2014-01-24 | View | ||
|
Objection based on: road traffic problems; close proximity to the River Usk; threat to wildlife and
protected species; pollution threat to the River Usk; threat of chemically contamiated soil and
airborne asbestos, especially to local residents.
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - Chepstow Friends of the Earth - Objection | |||
| Originator: | Chepstow Friends of the Earth | |||
| Date: | 2014-01-21 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour - 8 Courtney Street - Comments | |||
| Originator: | Neighbour | |||
| Date: | Not dated | View | ||
|
Possibly received by Newport council on 2014-01-22.
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - Neighbour - 9 Courtney Street - 15.01.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - Neighbour - 27 Collier Street - 12.01.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - Dave Harding - 06.01.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Consultation Response Neighbour 13.1279 - neighbour - Hodge - 30.12.2013 | |||
| Originator: | ||||
| Date: | 2013 | View | ||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice | |||
| Originator: | Newport council | |||
| Date: | 2014-11-13 | View | ||
|
Relates to Environmental Statement for 13/1279 and 251 dwellings. It's not clear where the notice
was posted, or in which publications it appeared.
The document is also available here.
| ||||
| Title: | Site/Press Notice | |||
| Originator: | Newport council | |||
| Date: | 2014-10-31 | View | ||
|
Relates to Environmental Statement for 13/1279 and 249 dwellings. It's not clear where the notice
was posted, or in which publications it appeared.
The document is also available here.
| ||||
| Title: | Supporting Information - Noise Impact Assessment relating to Apex Joinery | |||
| Originator: | Acoustics & Noise Limited | |||
| Date: | 2014-08-12 | View | ||
|
This report recommended that standard thermal 4/20/4 glazing should be fitted to all identified
habitable rooms and sealed to control noise ingress. The required ventilation rates should be
provided by an agreed mechanical ventilation system that does not compromise the facade sound
insulation or the resulting internal noise level.
The document is also available here.
| ||||
| Title: | Supporting Information - Noise Impact Assessment relating to Apex Joinery | |||
| Originator: | Acoustics & Noise Limited | |||
| Date: | 2014-06-26 | View | ||
|
This report was later superceded by a revised report dated 2014-08-12. This report recommended that
standard thermal 4/20/4 glazing should be fitted to all identified habitable rooms and sealed to
control noise ingress. The required ventilation rates should be provided by an agreed mechanical
ventilation system that does not compromise the facade sound insulation or the resulting internal
noise level.
The document is also available here.
| ||||
| Title: | Supporting Information - Hydraulic Model Review - Letter to confirm and clarify | |||
| Originator: | Waterman | |||
| Date: | 2014-05-28 | View | ||
|
NRW required confirmation and clarity for a number of aspects of the FCA before they could be
satisfied that the risks and consequences of flooding associated with the proposed development are
manageable. This letter provided greater detail and clarity in an attempt to address the issues
raised by NRW.
The document is also available here.
| ||||
| Title: | Site/Press Notice | |||
| Originator: | Newport council | |||
| Date: | 2014-04-12 | View | ||
|
The notice appeared in South Wales Argus, 12 April 2014.
The document is also available here.
| ||||
| Title: | Supporting Information - Additional Ground Water Monitoring Report | |||
| Originator: | Terra Firma (Wales) Limited | |||
| Date: | 2014-04-01 | View | ||
|
Relates to additional ground water sampling and testing.
The document is also available here.
| ||||
| Title: | Supporting Information Travel Plan - March 2014. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information 13.1279 - Remediation Strategy - February 2014. RECEIVED 09.04.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information 13.1279 - Noise Reduction caused by Accoustic Barrier - 11.03.2014 | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information 13.1279 - Remediation Strategy (February 2014) | |||
| Originator: | ||||
| Date: | 2014 | View | ||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice Press Notice | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||
| Title: | Drawing - OS Site Location Plan Plan Number sw49 (00) 01_Site Location Plan | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information Pre-assessment Report | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information - Transport Assessment | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information ES Addendum - List of ES Appendices as at 09.04.2014. RECEIVED 09.04.2014. | |||
| Originator: | ||||
| Date: | 2014-04-09 | View | ||
|
The document is also available here.
| ||||
| Title: | Supporting Information ES Addendum - Front Cover | |||
| Originator: | ||||
| Date: | Not dated | View | ||
|
The document is also available here.
| ||||