Planning Application 18/0293 Documents
|
DEVELOPMENT OF 195NO. RESIDENTIAL UNITS, INTERNAL ROAD NETWORKS, PARKING, LANDSCAPING AND ASSOCIATED WORKS AFFECTING PUBLIC RIGHT OF WAY 407/1 This page provides access to the documents relating to Newport council's Planning Application 18/0293.
Like the rest of our 'Glebelands' web pages, this page is under development.
Also, feel free to contact us if you would like to propose a new or amended summary for any of the documents listed below.
|
CONTENTS
| Title: | Planning Application Summary | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
The information is also available here.
| ||||
| Title: | List of Planning Application Documents | |||
| Originator: | Newport council | |||
| Date: | Not dated | View | ||
|
The information is also available here.
| ||||
| Title: | Decision Notice 18.0293 - EDN - 03.10.2024 18/0293 07/10/2024 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - CSP Plant - 25.01.2019. Advise no equipment in the area. 18/0293 29/01/2019 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Legal Agreement 18.0293 - Legal Agreement - 19.12.2018. Redacted. 18/0293 20/12/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Linesearch - 12.09.2018. Inquiry confirmation. 18/0293 30/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Western Power - 12.09.2018. Map. 18/0293 30/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Western Power - 12.09.2018. Letter. 18/0293 30/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073 (04) 322 C - House Type C Elevations (Type 2) 18/0293 05/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3037 (04) SS01 B - Street Scene 01 18/0293 02/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3037(04)SS04 B - Street Scene 04. Received 02.10.2018. 18/0293 02/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073(04)343 B - House Type E Elevations (Type 3) 18/0293 02/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 1795 002-2 - Refuse Vehicle Tracking Sheet 2 of 2. Received 26.09.2018 18/0293 01/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 1795 103 D - Engineering Layout Complete Phase Plan. Received 26.09.2018. 18/0293 01/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073 (04)100 O - Site Layout. Received 26.09.2018. 18/0293 01/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 1795 002-1 - Refuse Vehicle Tracking Sheet 1 of 2. Received 26.09.2018. 18/0293 01/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Officer Report 18.0293 - Officer Report - Appendix A - Conservation Objectives of the River Usk SAC 18/0293 01/10/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Highways - 28.09.2018. Comments. 18/0293 28/09/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Officer Report 18.0293 - Officer report 18/0293 25/09/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Highways - 18.09.2018 18/0293 20/09/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Landscaping - 08.08.2018. Comments. 18/0293 14/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded Drawing 1795 002 - Refuse Vehicle Tracking. Received 03.08.2018. SUPERSEDED 26.09.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 18/0293 - email from agent - 03.08.2018. Regarding revised plans. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded Drawing 3073 (04)100 N - Site Layout. Received 03.08.2018. SUPERSEDED 26.09.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing A102732 P LA8 F - Planting Details 7 of 7. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded Drawing 1795 103 B - Engineering Layout. Received 03.08.2018. SUPERSEDED 26.09.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Design Access Statement Design & Access Statement (August 2018). Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Addendum to Environmental Statement (July 2018). Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Proposed Piling Strategy (Revision 01, March 2018). Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073 (04)331 B - House Tyoe C & D Elevations. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073 (04)333 B - House Type C & D Elevations. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073 (04)281 A - House Type I & J Floor Plans, Ground floor Plan. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Drawing 3073 (04) 381 C - House Type I & J, Elevations. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information List of Plans & Documents for Approval. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Correspondence Received 18.0293 - Letter from agent - 03.08.2018. Covering Letter for Revised Plans. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Supplementary Piling Note. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Environmental Statement - Non Technical Summary. Received 03.08.2018. 18/0293 06/08/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - EH - Noise - 07.06.2018. Condition requested. 18/0293 20/06/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - DCWW - 29.05.2018. No objection. 18/0293 14/06/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Housing Manager - 29.05.2018. Supports. 18/0293 13/06/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Highways - 05.06.2018. Comments. 18/0293 08/06/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Drainage - 17.05.2018. More information needed. 18/0293 29/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - EH - Scientific Officer - 24.05.2018. Condition required. 18/0293 25/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - CNC/NRW - 21.05.2018. Conditions required. 18/0293 24/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Otter Mitigation Strategy (March 2017). Received 04.05.2018. Agent confirms this is the report referenced in the ES. 18/0293 10/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | upporting Information Wildlife Protection Plan / Environmental Management Plan (April 2017). Received 04.05.2018. Agent confirms this is the report referenced in the ES. 18/0293 10/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Heddlu Gwent Police - DOCO - 23.04.2018. Comments. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - DCWW - 01.05.2018. Sewer Plan. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - Landscaping - 02.05.2018. Comments. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - DCWW - 01.05.2018. Water Plan. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - DCWW - 01.05.2018. Covering letter. Conditions requested. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - DCWW - 01.05.2018. Developing near watermains. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Planning Policy - 01.05.2018. Further comment. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - NCC Education Section - 02.05.2018. Comments on S106. 18/0293 04/05/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information 18.0293 - email from agent - 24.04.2018. Revised red line and housing density. 18/0293 27/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Ecology - 25.04.2018. Comments. 18/0293 27/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing - OS Site Location Plan Drawing 3073 (04) 001 B - Site Location. Received 24.04.2018. 18/0293 27/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded Drawing 3073 (04) 100 I - Site Layout. Received 24.04.2018. SUPERSEDED 03.08.2018. 18/0293 27/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - W&W Utilities - 18.04.2018. Covering letter. 18/0293 26/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Planning Policy - 18.04.2018 18/0293 26/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - W&W Utilities - Plan - 18.04.2018 18/0293 26/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18.0293 - PROW - 20.04.2018. Comments. 18/0293 23/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice 18/0293 - Site Notice Locations (x3) - 16.04.2018 18/0293 17/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Neighbour 18/0293 - Nicholls - 16.04.2018. Object. 18/0293 16/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - Waste Manager - 10.04.2018. Comments. 18/0293 16/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice 18/0293 - Revised Site Notice - 16.04.2018 18/0293 16/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice 18.0293 - Revised Site Notice - 16.04.2018 18/0293 16/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Consult Response Statutory 18/0293 - housing Manager - 13.04.2018. Comments. 18/0293 16/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Site/Press Notice Site Notice 18/0293 09/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 10.1 Flood Consequences Assessment 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT C 3073(04)323B - Elevations T3 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 1.1 Newport Council Scoping Opinion February 2017 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT F 3073(04)252 - First Floor Plan. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 13.4 Road Traffic Noise Assessment 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 1 - Introduction March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT H 3073(04)371C - Elevations 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing 3154 (90)204A Proposed Site Plan (5 of 6) 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 8.3 Phase 1 of Development 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT A 3073(04)201 - Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 16 - Summary and Conclusion March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Materials Sheet 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT C+D 3073(04)332B - Elevations T2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)SS04A - Street Scence 04. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 5.1 Site Layout Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 13.5 Consultation 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT F 3073(04)253 - Second Floor Plan. SUPERSEDED 03.08.2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 11.1 Drainage Strategy 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT K+L 3073(04)2101 - Ground Floor Plan. SUPERSEDED 03.08.2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 15 - Socio Economic Context March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 2 - The EIA Process March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 8.2 Habitats and Vegetation 2017 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing 3154 (90)205A Proposed Site Plan (6 of 6) 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 14.1 Air Quality Assessment Detailed Methodology 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT A 3073(04)202 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 1.2 Newport Council Screening and Scoping Opinion November 2012 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT C+D 3073(04)333A - Elevations T3. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT F 3073(04)351A - Elevations. SUPERSEDED 03.08.2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix H 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT K+L 3073(04)2102 - First Floor Plan. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Delivery Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 12.1 Location of the Proposed Development Site and Local Highway Network 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 14 - Air Quality March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 3 - Cumulative Impact March 2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing 3154 (90)208A Proposed Site Sections 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 4.1 Site Location Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT A 3073(04)301B - Elevations T1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)SS05B - Street Scence 05. SUPERSEDED 03.08.2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT K+L 3073(04)2301 - Elevations. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 12.5 Local Amenities within walking distance of the site 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Figure 13.1 Map of Monitoring Locations and Site Boundary 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 13 - Noise and Vibration March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Construction Site Layout and Phasing Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 4.2 Public Right of Way Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Stone Sample 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Swept Path Analysis 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.1 Geotechnical and GeoEnvironmental Report March 2013 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Otter Mitigation Report V3 FINAL 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT A 3073(04)302B - Elevations T2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2211 - Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 11.2 DCWW Sewerage Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Figure 13.2 Day Time Facade Noise Levels 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 terrace 3073(04)2200 - Ground + 1st Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)SS06A - Street Scence 06. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.2 Addiitonal Ground Water Monitoring April 2014 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT B 3073(04)211 - Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Figure 13.3 Night Time Facade Noise Levels 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2212 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Piling Strategy rev 1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 terrace 3073(04)2201 - Second Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT I+J 3073(04)281 - Ground Floor Plan. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090-304C Gabion Basket Retaining Sections 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT E 3073(04)241 -Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Otter Mitigation Report V3 FINAL 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 4 - Site Context March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 7.1 LVIA Figures 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.3 Remediation Strategy August 2015 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.8 cover 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 12.2 Traffic Survey Data 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Herbert Road retaining walls 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)SS07A - Street Scence 07. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)001A- Site Location Plan. SUPERSEDED 24.04.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Figure 14.1 Air Quality Site Plan and Receptor Locations 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2213 - Second Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 terrace 3073(04)2322A - Elevations T2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 7.2 General Assessment Methodology 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 5 - Project Description March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 12.3 Public Transport Services 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT I+J 3073(04)282 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.5 Land Gas Monitoring and Risk Assessment Report July 2005 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.8 Part 1 - Reports and Figures 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT E 3073(04)242 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Planning Statement 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Environmental Statement - Volume 1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Construction Environmental Management Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Acoustic Fencing Data Sheet 12 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT B 3073(04)212 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Figure 14.2 Air Quality Construction Phase Assessment Bands 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)100G - Site Layout. SUPERSEDED 24.04.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2213 - Second Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 terrace 3073(04)2321A - Elevations T1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 11.3 LDP Extract 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT I+J 3073(04)381B - Elevations. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090-305 Gabion Basket & Reinforced Bank Extents Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT E 3073(04)341A - Elevations T1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090-300A Reinforced Earth Details (60 Degrees) 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.4 Geotechnical and GeoEnviornmental Phase 1 Report February 2017 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.8 Part 2 - Appendix A - I 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)V01B - Birds Eye View from Phase 1. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT B 3073(04)311B -Elevations 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Pre-Application Consultation Report 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Superseded Document Design and Access Statement. SUPERSEDED 03.08.2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT K 3073(04)291 - Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT E 3073(04)342A - Elevations Type 2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 12.6 Local Cycle Routes within the Vicinity of the Site 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.6 IG Report May 2007 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.8 Part 5 - Appendix P - R 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information 17-0970 DN Redischarge of Condition 16 Reen and partial condition 24 boundary treatments around reen 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)SS01A - Street Scence. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT G 3073(04)261 - Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)V02B - Birds Eye from Schl River End. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix A 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information 217 Info Sheet - Stone Facing 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 8 - Ecology and Nature Conservation March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2213 - Second Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 12.4 Rail Network Map 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT E 3073(04)342A - Elevations T2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT K 3073(04)292 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.7 Council Letter 2009 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT G 3073(04)262 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.8 Part 3 - Appendix J 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)SS02B - Street Scence 02. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix B 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information 1155090 - Reen Sizing 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090-301A Reinforced Earth Details (70 Degrees) 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2311A - Elevations T1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT E 3073(04)344B - Elevations T4 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 9 - Ground Conditions March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT K 3073(04)293 - Second Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT C 3073(04)221 - Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.9 Soils Validation Report December 2016 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT G 3073(04)361A -Elevations 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)V03B - Birds Eye from Schl EmrAcc. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 9.8 Part 4 - Appendix K - O 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT C+D 3073(04)231 -Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT L1 3073(04)2312A - Elevations T2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix C 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 13.1 Glossary of Acoustic Terminology 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090 - 551 Reen Setting Out 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT K 3073(04)391A - Elevations T1 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded 3073(04)V04B - Birds Eye from Courtney Rd. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 10 - Flood Risk 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT H 3073(04)271A Ground Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT C+D 3073(04)232 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT C 3073(04)222 - First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090-302B Gabion Basket Retaining Sections 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix D 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 13.2 Baseline Noise and Vibration Survey 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information 223 Specification of Gabion fill 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 6 - Planning Policy Context March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 11 - Drainage 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT K 3073(04)392A - Elevations T2 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT C 3073(04)322B - Elevations T2. SUPERSEDED. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing SMA 1155090-303C Gabion Basket Retaining Sections 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix E 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 13.3 Construction Noise Assessment 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Herbert Road Travel Plan March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendices Contents 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT F 3073(04)251 - Ground Floor Plan. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 7 - LVIA March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded HT C+D 3073(04)331A - Elevations T1. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 3 Appendix 8.1 Herbert Road Phasing of Development 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Volume 2, Chapter 12 - Traffic Transport and Movement March 2018 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing HT H 3073(04)272A First Floor Plan 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Drawing Superseded A102732 - Landscape Proposals Rev E. SUPERSEDED 03.08.2018. 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information PAC Report Appendix G 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Supporting Information Transport Statement Rev a 18/0293 06/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||
| Title: | Application Form Application Form 18/0293 05/04/2018 | |||
| Originator: | ||||
| Date: | View | |||
|
The document is also available here.
| ||||